Chuckle Chums

CLOMPFS04

Play Red & Forest Green
Play Orange & Lavender Dilly
Creazy Pink & Sand Beige
Get a Quote
Ready to bring fun to your space?

Request Your Custom Quote Today!

We are committed to protecting your privacy. We will never collect information about you without your explicit consent.

Description

Step into a world of whimsy and laughter with the Clown Capade Series. The funny looking tilted Clown Canopies brings joy and excitement to children's playtime. This series dazzles with a spectrum of bright colors, creating a cheerful and inviting playground environment reminiscent of a lively circus tent. Includes a variety of entertaining activities such as swinging trapeze bars, spiral slides, hanging rings, and challenging climbing structures.

Age Group 5-12 years
Activities
Sliding
Climbing
Hanging
LENGTH 1079.5 cm
WIDTH 586.74 cm
HEIGHT NA

Specifications

Explore the vibrant and playful Clown Capade Series, where tilted Clown Canopies and a burst of bright colors turn any playground into a lively circus. This series features fun activities like trapeze bars, spiral slides, and climbing structures, all designed to spark joy and encourage adventurous play in a cheerful, circus-like environment.

01
Age Group

5+ Years

02
Key User Group

5 - 12 Years

03
Capacity

15

Icon
Climbing
Icon
Sliding
Icon
Hanging
01
Product Area

35'5" x 19'3"

02
Safe Play Area

41'5" x 23'3"

3 years warranty for Galvanized pipe, Roto molded parts, Composite laminates and Play rope.

1 years warranty for Springs, Bearings and Spare parts.

Warranty coverage

This warranty applies to Funplay’s products for the time periods described for each product type above and with the limitations described in this warranty. The warranty period applies from the date of purchase by the first customer. This warranty covers only defects in materials, production errors and structural integrity failures caused by defects in design, materials or manufacturing. Funplay’s liability under this warranty is limited to repair or replacement of defective products, without charge, at Funplay’s discretion.

Proper installation and maintenance

The warranty only applies if funplay’s products have been installed according to the instructions provided by Funplay and maintained correctly according to the Funplay Maintenance Manual. All warranty claims shall be accompanied by full documentation for proper installation and maintenance.

Warranty exclusions

This warranty does not cover any damage caused by accident, improper care, negligence, normal wear and tear, surface corrosion on metal parts, discolored surfaces and other cosmetic issues or failures due to misuse or vandalism. Natural changes in wood over time are considered cosmetic issues and are not covered.

Playground Equipment Installation Guidelines

Proper installation ensures the safety and longevity of our products. We offer two primary installation methods: self-standing and grouting. Follow these guidelines carefully to ensure a secure and stable installation.

Installation Methods
  • Self-Standing
  • Self-Standing Installation Image In this method, the base plates of the equipment are directly fastened to the concrete surface using anchor bolts. This type of installation is generally done on podiums and terraces where the surface available is Plain Cement Concrete (PCC). Ensure minimum PCC thickness of 180 mm.
  • Grouting
  • Grouting Installation Image This method is generally preferred when the proposed area is on ground level. Holes of approximately 1.5' x 1.5' x 1.5' (450 mm x 450 mm x 450 mm) are dug, and the equipment base pipes are placed in the holes. The holes are then filled with concrete to ensure a solid base.

Pre-Installation Guidelines

Before you begin the installation process, it's essential to follow these pre-installation guidelines to ensure a smooth and efficient setup:

  • Site Preparation
  • Ensure the proposed area is clear of any rocks, debris, or other obstructions.
  • Check that the site is correctly leveled.
  • Provide proper drainage to avoid accumulation of water.
  • Foundation Markings
  • Make accurate markings as per the foundation drawings provided.
  • Ensure the depth of PCC is as per the given standard depth.
  • Material Handling
  • Ensure proper material handling equipment is available on site.
  • Provide lifts in case the installation is on terraces or podiums.
  • Review Installation Drawings
  • Read the installation drawings provided to familiarize yourself with the installation methods.
CONTACT US
Ready to bring fun to your space?

Contact Us

We are committed to protecting your privacy. We will never collect information about you without your explicit consent.